NTS Logo
NTSNusantara Teknik Sejahtera

Projects Across Indonesia

A portfolio of completed projects spanning MEP, HVAC, and digital solutions across hospitality, aviation, industrial, government, and commercial sectors throughout Indonesia.

Sector: ALL

Hotel Golden Palace Lombok
Hotels
Hotel Golden Palace Lombok logo

Hotel Golden Palace Lombok

Mechanical Electrical and Plumbing

Hotel POP Bali
Hotels
Hotel POP Bali logo

Hotel POP Bali

Mechanical Electrical and Plumbing

Komodo Airport, Labuan Bajo
Aviation
Angkasa Pura logo

Komodo Airport, Labuan Bajo

MEP System

Kualanamu International Airport
Aviation
Angkasa Pura II logo

Kualanamu International Airport

HVAC System

Bank Mandiri Office
Commercial
Bank Mandiri logo

Bank Mandiri Office

HVAC System

Fitness Center HVAC & Maintenance
Commercial
First Fitness & Celebrity Fitness logo

Fitness Center HVAC & Maintenance

Maintenance and HVAC System

PLTU Palu 2×50 MW Power Plant
Industrial
PLTU Palu logo

PLTU Palu 2×50 MW Power Plant

HVAC System

Hydroponic System International
Government
Hydroponic Systems International logo

Hydroponic System International

Mechanical and Electrical

Ministry of Foreign Affairs Office
Government
Kementerian Luar Negeri RI logo

Ministry of Foreign Affairs Office

HVAC/MEP System

MMS Land Development
Commercial
MMS Land logo

MMS Land Development

HVAC/MEP System

Restaurant HVAC, Pangkal Pinang
Commercial
Ichiban Sushi & Ta'wan Resto logo

Restaurant HVAC, Pangkal Pinang

HVAC/MEP System

Amazon Data Center 065 Karawang
Industrial
Amazon Web Services logo

Amazon Data Center 065 Karawang

HVAC System

PT. Fajar Mas Murni Facility
Industrial
PT. Fajar Mas Murni logo

PT. Fajar Mas Murni Facility

HVAC/MEP System

Engineering in Action

Beyond the Blueprint.
Delivering Reality.

Strategic Oversight
01 // FIELD_LOG

Strategic Oversight

Precision Ducting
02 // FIELD_LOG

Precision Ducting

High-Altitude Installation
03 // FIELD_LOG

High-Altitude Installation

Industrial Infrastructure
04 // FIELD_LOG

Industrial Infrastructure

On-Site Coordination
05 // FIELD_LOG

On-Site Coordination

Quality Assurance
06 // FIELD_LOG

Quality Assurance

Complex Airflow Systems
07 // FIELD_LOG

Complex Airflow Systems

Infrastructure Setup
08 // FIELD_LOG

Infrastructure Setup

Collaborative Engineering
09 // FIELD_LOG

Collaborative Engineering

Technical Inspection
010 // FIELD_LOG

Technical Inspection

Unit Calibration
011 // FIELD_LOG

Unit Calibration

Field Safety
012 // FIELD_LOG

Field Safety

Operational Readiness
013 // FIELD_LOG

Operational Readiness

Component Delivery
014 // FIELD_LOG

Component Delivery

Smart Panel Integration
015 // FIELD_LOG

Smart Panel Integration

Mission Critical Piping
016 // FIELD_LOG

Mission Critical Piping

Documenting the grit and precision behind every NTS integration.

Trusted By Industry Leaders

Amazon
Angkasa Pura
Celebrity Fitness
Fitness First
Golden Palace Hotel
Hydroponic System
Ichiban Sushi
Kementerian Luar Negeri
Mandiri
MMS Land
PLN
Pop Hotel
Fajar Mas Murni
Angkasa Pura II - Kualanamu
Ta Wan Resto
Technical SupportSpeak with an Engineer